Licensed California plumber, CSLB #1156366

Filmed On The Job Our Work

Every clip here was filmed through Jacob's glasses, showing his own work: what he sees as he works. Nothing is stock and nothing is staged. It's sorted by the kind of work, since that's what you'll be calling about.

8 a.m. to 5 p.m., seven days a week. No after-hours emergency service.

Through Jacob's glasses: a torch and solder on copper through an opening in a ceiling

Breaking out, digging down to the old lines, and new copper in the trench.

Water Lines, From The Ground Up

At A Commercial Site

One Riser, Start To Finish

At a commercial site, copper joined with press fittings instead of solder. Seven steps, in order.

  1. 01Lay It Out

    Through Jacob's glasses: copper pipe and elbows laid out on a concrete floor

    The run laid out on the floor

  2. 02Measure

    Through Jacob's glasses: a tape measure along copper pipe and an elbow

    A tape along the pipe

  3. 03Cut

    Through Jacob's glasses: a tubing cutter on copper pipe

    A tubing cutter on the copper

  4. 04Deburr

    Through Jacob's glasses: a deburring tool inside a cut copper end

    Cleaning the inside of the cut end

  5. 05Press

    Through Jacob's glasses: a press tool closing a copper fitting

    The press tool closing a fitting

  6. 06Assemble

    Through Jacob's glasses: copper pipe and press fittings being assembled

    The riser coming together

  7. 07Set It

    Through Jacob's glasses: hands fitting a copper riser beside stainless equipment

    Set in place beside the equipment

Parts laid out and dry-fitted on the tailgate before the water goes off.

Before The First Cut

Call The Plumber

Something leaking, backing up or not heating?

(661) 310-8269

8 a.m. to 5 p.m., seven days a week. No after-hours emergency service.

© 2026 JTC Plumbing | All Rights Reserved. | Privacy Policy | Site Map

Made by George Gabriel

Call (661) 310-8269